A Notice of Decision is issued today the installation of a multi-stage infiltrating bioretention stormwater system at the northeast corner of the facility located at 12027 Three Lakes Road, including a lift station and valve vault with flow splitter to direct the flow via a force main to a pea gravel pretreatment system and infiltrating bioretention treatment system. Treated flows will discharge into the ground. An emergency overflow is incorporated into the design. Visit the Self-Service Permit Portal to view the Planning Director’s Decision, Notice of Decision, and other documents related to the proposal.
For more information, contact Planner Leah Chulsky at 425-328-0078.