Project overview
The project at the Second Street and Pine Avenue intersection involves the improvement of intersection traffic signal stop controls to improve vehicular and pedestrian safety and replace the cable system holding up the traffic signal heads with permanent, modern infrastructure.
| Timeline | Summer 2026 |
| Project Status | Design |
| Funding | Transportation Benefit District (TBD) and Real Estate Excise Tax (REET) funds
|
What to expect
Alternatives to be analyzed consist of a round-a-bout or replacing in kind with traffic signals. There may be changes to channelization and lane configurations. Curb ramps radii will be revised to provide better turning maneuvers for large trucks and to help prevent use of non-truck routes.